NEC Express5800/GT110d-S Guía de instalación Pagina 242

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 278
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 241
6. Setting Up Windows Server 2003
Chapter 1 Installing Windows
18. After the system starts,
follow step 1 to start Broadcom Control Suite3 and confirm that a team has
been created. Confirm the team settings on the Information window to the right.
Smart Load Balancing and Failover (without Standby Member)
Smart Load Balancing (Auto-Failback Disable) (with Standby Member)
Team setup is now complete.
Express5800/GT-110d, GT-110d-S, R110d-1E, E110d-1 Installation Guide (Windows)
242
Vista de pagina 241
1 2 ... 237 238 239 240 241 242 243 244 245 246 247 ... 277 278

Comentarios a estos manuales

Sin comentarios