NEC Express5800/GT110e-S Guía de instalación Pagina 240

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 275
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 239
6. Setting Up Windows Server 2003
Express5800/GT-110e, GT-110e-S, R110e-1E Installation Guide (Windows)
240
Chapter 1 Installing Windows
18. After the system starts, start Broadcom Control Suite by clicking the Broadcom Control Suite icon in
Control Panel, and confirm that a team has been created. Confirm the team settings on the Information
window to the right.
Smart Load Balancing and Failover (without Standby Member)
Smart Load Balancing (Auto-Failback Disable) (with Standby Member)
Team setup is now complete.
Vista de pagina 239
1 2 ... 235 236 237 238 239 240 241 242 243 244 245 ... 274 275

Comentarios a estos manuales

Sin comentarios