NEC Express5800/R120f-1M Guía de instalación Pagina 225

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 344
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 224
5. Setting Up Windows Server 2008 R2
Express5800/R120f-1M, R120f-2M Installation Guide (Windows)
225
Chapter 1 Installing Windows
5. When the following message appears, click OK.
6. Eject EXPRESSBUILDER DVD from the optical disk drive, and then restart the system.
Team deletion is now complete.
5.5.4
Setting up team (PROSet)
This section describes procedures for creating, deleting, and configuring a team by network adapter.
The optional LAN board N8104-145 only is supported.
(1) Team types
The following team types are supported.
Adapter Fault Tolerance (AFT)
Adaptive Load Balancing (ALB)
Static Link Aggregation (GEC)
Switch Fault Tolerance (SFT)
Note
For how to delete an adapter team, refer to Chapter 1 (5.5.4 Setting up team
(PROSet) - (3) Procedure for deleting team).
Check the following points when deleting an adapter team.
When replacing the motherboard or optional LAN boards after an adapter
team is configured, delete the adapter team first.
If a team exists, delete the team first. If the team is bound to a Hyper-V virtual
adapter, unbind the Hyper-V adapter before deleting the team.
Do not configure a team with network adapter that is using iSCSI feature.
Be sure to set up LiveLink when creating a team in the following cases.
Smart Load Balancing and Failover (without Standby Member).
Smart Load Balancing (Auto-Failback Disable) (with Standby Member) using
more than two network adapters
When using Smart Load Balancing (Auto-Failback Disable) (with Standby
Member) using two network adapters, setup for LiveLink is not essential.
Vista de pagina 224
1 2 ... 220 221 222 223 224 225 226 227 228 229 230 ... 343 344

Comentarios a estos manuales

Sin comentarios