5-44 Installing and Using Utilities
Procedure in the ft server utility
Perform the procedure below before replacement of a component.
1. Select the target component from the main window of the ft server utility.
The screen of the target component appears.
2. Check the current state of the target component with the LEDs.
3. Click the [Clear] button in [MTBF Clear] of the target component.
The MTBF clearing result can be confirmed by the LEDs on the target component. The
result of the MTBF clearing operation is registered in the syslog.
4. Start the component.
Sample screen of ft server utility
Main window
[PCI module] screen