NEC Express5800/R120a-1 Manual de usuario Pagina 32

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 118
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 31
Operation View
The Operation View indicates the status and results of operations executed in the computer after the RAID Viewer is
started.
Figure 3 Operation View
The following operations may appear on the Operation View. For each operation, the target component and the status
of the operation appear.
Initialize
Rebuild
Consistency Check
Operations being executed while the RAID Viewer is started and those started after the RAID Viewer is started are
listed.
You can see the status and result of operations by the value of [Status].
Status Description
Running (N %) The operation is be running (N is progress).
Completed The operation completed.
Failed The operation failed.
Stopped The operation stopped (by [Stop]).
Paused (N %) The operation is paused (N is progress).
Queued The operation is queued.
Stop Processing The operation is processing [Stop].
Terminated operations continue to appear until the RAID Viewer is closed. However, the terminated operations will not
appear at the next start of the RAID Viewer.
To delete an operation terminated while the RAID Viewer
is started, click the operation to be deleted and [Delete]
.
An operation being executed can be stopped on the way.
To do this, click the operation to be stopped and [Stop].
Operations allowed to be stopped vary depending on running modes. See "Standard and
Advanced Modes" for details.
32
Vista de pagina 31
1 2 ... 27 28 29 30 31 32 33 34 35 36 37 ... 117 118

Comentarios a estos manuales

Sin comentarios