Nec 320Fc Manual de usuario Pagina 71

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 120
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 70
Performing the Upgrade 4-1
Chapter 4
Performing the Upgrade
4-
Performing the Active Upgrade process can involve the following tasks:
• Performing a readiness check
• Splitting the system
• Merging the System
• Committing the upgrade
• Aborting the upgrade (if necessary)
• Finishing the upgrade
• Viewing Active Upgrade process status
Performing a Readiness Check
Before you can initiate split mode on a system, the system must pass a readiness
check. The readiness check verifies that your system meets the prerequisites for the
Active Upgrade process. For example, the readiness check ensures that:
• The system is currently running in duplex mode.
• The disks you selected as system disks are present and are mirrored with RDR.
• The system contains two properly configured VTM adapters.
• The embedded Ethernet PCI adapters in your system are configured into Ethernet
teams, and each team contains at least one adapter from each physical enclosure.
• The application services you specified for control are currently running, and can be
stopped when necessary.
• The executable file for any custom action is present on the system and ready to run.
To perform a readiness test, do one of the following:
• Click Next on the Upgrade Summary page (if you are using a configuration file).
• Click Active Upgrade on the navigation bar (the readiness test starts automatically
if you have recently opened or changed your configuration).
• Click Retry on the Active Upgrade page.
Vista de pagina 70
1 2 ... 66 67 68 69 70 71 72 73 74 75 76 ... 119 120

Comentarios a estos manuales

Sin comentarios